Header We4Ce

DECEMBER 2021 | TNO INSIGHTS

Zo maken we windmolenwieken van 120 meter mogelijk | TNO

 

MARCH 2021 | Strongest M36 bushing of the World!

On the Interna­tional Wind Power Composite Material Summit “2021第七届中国国际风电复合材料高峰论坛” from 25-26 March, Mr Edo Kuipers will present a speech and Mr Wang Lu (Michael Wang) will attend personally for face-to-face meetings.

Download the leaflet

 

DEC 2020 | Bushings in Rotor Blades: Technology and Strength Drivers

On December 7, Edo Kuipers spoke at The AMI Wind Turbine Blade Virtual Summit. You can read his presentation here.

 

JULY-AUG 2020 | Blade Root Bushing Technology

For wind turbine blades, generally two main root connection types exist to connect the rotor blade to the hub of the turbine: the T-bolt connection or bushing technology.

Read full article...

 

MAR 2020 | We4Ce and Boltlife in the news for the development of
reliable blade root to wind turbine hub connections

Read full article...

 

FEB 2020 | We4Ce Root Bushing Solution for Rotor Blades

M.A.R.S. 2020: Modular Adaptive Root Solution
Read full article...

 

FEB 2019 | Using Polyester Resins in Rotor Blades A Cost Reduction Opportunity?

A case study performed within We4Ce shows a blade cost reduction opportunity for polyester resins in rotor blades. However, will this cost reduction for the blade also lead to a lower cost of energy? By Edo Kuipers, Engineering Manager, We4Ce, The Netherlands
Read full article...
 

 

SEP 2015 | We4Ce: Samen sterk over de grens!

Er ligt in het buitenland voldoende potentieel voor windenergiebedrijven. Download hier het volledige artikel uit het Financieel Dagblad.

Terms & Conditions Copyright © since 2008